ZCOPE Tip: Connections (task lists, milestones, documents, blog posts)

Constance Stickler am 19. November 2009 um 9:40 Uhr

ZCOPE_Connections

In ZCOPE you can connect documents and blog posts with task lists and tasks.

I will illustrate this tip with a case study. Let‘s suppose the task list is called „Design website“ and there is a task called „header image“.

The design company uploads a draft for the image and connects it with the task. At the same time a conversation resp. feedback is started in the blog. The design company writes that the first draft was made according to the requirements mentioned at the last meeting but that it became obvious during the design process that the text was too long and if it could be shortened. Also this post will be connected to the task. The customer sends a suggestion for the shorter text and wants the font colour to be slightly darker. The design company edits the image and uploads the new version.

A corresponding icon will be shown with the task if it‘s connected to a document or a blog post. By clicking on the icon one gets to the latest version of the document or the blog post.

RSS Feed zu diesem Beitrag abonnieren.

Kommentar abgeben



Kommentare als RSS Feed abonnieren oder ein TrackBack zu 'ZCOPE Tip: Connections (task lists, milestones, documents, blog posts)' machen.